Question Number: –1
________ identifying which quality standards are relevant to the project and determining how to satisfy them.
► Quality Planning
► Communications Planning
► Organization Planning
► Staff Acquisition
Question Number:-2
These all are outputs of Initiating Process except
► Project Manager Assignments
► Constraints
►
Selection Criteria
► Assumptions
Question Number:-3
Project management processes can be organized into _____________ groups
► Four
► Five
► Six
► Seven
Question Number:-4
Product quality depends on its conformance to ______
► Software requirements
► Development standards
► Implicit requirements
► All of given
Question Number:-5
_______is the technical kernel of software engineering
► Design
► Implementation
► Requirements analysis
► Testing
Question Number:-6
Mode of specification has a great impact on quality of solution. Forcing SWE to work with incomplete, inconsistence, or misleading specifications result in frustration and confusion affecting:
► Quality
► Timeliness and
google_ad_slot = “4938447392”;
google_ad_width = 468;
google_ad_height = 60;
// ]]>
► Completeness of SW product
► All of given
Question Number:-7
Finally, the specification includes a ________
► Bibliography
► Appendix
► Both Bibliography and Appendix
► Reference
Question Number:-8
Cognitive model describes a system as perceived by its _________
► User community
► Developer
► Top level management
► Manager
Question Number:-9
A review of the Software Requirements Specification is conducted by ________
► Software developer
► Customer
►
Both the software developer and the customer
► Top level management
Question Number:-10
A meeting is conducted at a _________ and attended by both software engineers and customers.
► Software engineer site
► Neutral site
► Customer site
► Company site
Question Number:-11
The model serves as the basis for the creation of ________ for the Software.
► Design
► Maintenance
► Testing
► Specifications
Question Number:-12
Throughout evaluation and solution synthesis, the analyst’s primary focus is on
► “What, not “how.”
► Model
► Evaluation and Synthesis
► Specification
Question Number:-13
In problem evaluation area of effort, once problems have been identified, the ___________determines what information is to be produced by the new system and what data will be provided to the system.
► Analyst
► Designer
► Coder
► Manager
Question Number:-14
Requirements are refined and analyzed to assess their clarity, completeness, and_______
► Correctness
► Consistency
► Concurrency
► None of given
Question Number:-15
A software project that meets all the stated objectives is a success of _________
► Project quality
► Project fundamental purpose
► Project management myth
► Project requirement
Question Number:-16
All of the following describe the activity list except:
► It’s an extension of the WBS
► It include all activities of the project
► It describe the WBS update
► It include a description of project activities
Question Number:-17
Software project are carried out sequentially and that each phase is completed before the next is taken up.
► The Prototyping Model
► The Incremental Model
► The Waterfall model
► The Spiral model
Question Number:-18
Project management is a _________of constant communication and negotiation.
► Process
► Concept
► Practice
► None of given
Question Number:-19
These all are design phase activities except
► Output Design
► Input Design
► The software test plan
► Software Selection
Question Number:-20
Which organization has set the de facto standards for project management techniques?
► PMBOK
► PMI
► PMA
► PMO
Question Number:-
21 ( Marks: 2 )
Give the name of configuration control tools?
Question Number:-
22 ( Marks: 3 )
Software requirements analysis a bridge between system engineering and software design, show it by diagram.
Question Number:-
23 ( Marks: 5 )
Write down the software process player’s names and their roles in projects.
Question Number:-
24 ( Marks: 10 )
Explain the following terms regarding project characteristics and project dimensions.
· Temporary,
· Unique,
· Aims,
· People,
· Process