CS615 today Solved MCQs Before Mid

________ identify which quality standards are relevant to the project and determines how to satisfy them

  • Quality planning
  • Quality assurance
  • Quality control
  • Process control

The overall role of Software in a larger system is identified during

  • Requirements engineering
  • Process engineering
  • System engineering 
  • All of given

The British Standards Institution (1986) has stated the quality as

  • The ability of a software product to satisfy its specified requirements
  • “An inherent or distinguishing characteristic or a property”
  • “Quality is in the eye of the beholder, a matter, of the client’s judgment.” 
  • All of the given

McCall (MCC77) and his colleagues proposed some software quality factors based on _______ most important aspects of a software product:

  • 4
  • 6
  • 5

Inefficient project management style is a

  • Product-related problems
  • Technology-related problems
  • Process-related problems
  • People-related problems

Upon evaluating current problems and desired information (input and output), the analyst begins to ______

  • Synthesize solutions 
  • Model
  • Specification
  • All of given

These all are Product Revision Factors except

  • Usability
  • Maintainability
  • Flexibility 
  • Testability

We can classify the problems that affect software projects into _______ categories

  • 3
  • 5
  • 6

The check-in and checkout facilities provide_________

  • Best control
  • Component control
  • SCI control
  • Synchronization control

The code generation step performs the task

  • Translated specification into a machine-readable form 
  • Translated design into a machine-readable form
  • Translated requirements into a machine-readable form
  • Translated user data into a machine-readable form

Research-oriented software development is a

  • Technology-related problems
  • Process-related problems
  • People-related problems
  • Product-related problems

A meeting is conducted at a _______ and attended by both software engineers and customers.

  • Software engineer site
  • Neutral site
  • Customer site
  • Company site

Reviews conducted at each of this phase/s_____

  • Analysis
  • Design
  • Coding
  • All of given

All given below are the problems that affect software projects except:

  • Product-related problems
  • Technology-related problems
  • Procedure-related problems
  • People-related problems

_______is the technical kernel of software engineering

  • Design
  • Implementation
  • Testing
  • Requirement Analysis

Both the software engineer and customer take an active role in software requirements engineering-a set of activities that is often referred to as

  • Analysis
  • Design
  • Specification
  • System acceptance

The model serves as the basis for the creation of ______ for the Software.

  • Design
  • Maintenance
  • Testing
  • Specifications

Before requirements can be analyzed, modeled, or specified they must be gathered through a/an _______

  • Elicitation process
  • Interviewing
  • Meeting
  • None of given



Technology-related problems include _____

  • Overestimated savings from reusable components and new tools and methods
  • Switching tools in mid-way
  • Integrating different software products in cross-platform implementation
  • All of given

Insufficient identification is a

  • Technology-related problems
  • Process-related problems
  • People-related problems
  • Product-related problems

Throughout evaluation and solution synthesis, the analyst’s primary focus is on ______

  • “Not what, not “how”
  • “What, also “how”
  • “What, not “how”
  • None of given

The overall role of Software in a larger system is identified during

  • Requirements engineering
  • Process engineering
  • System engineering
  • All of given

In problem evaluation area of effort, once problems have been identified, the ___________determines what information is to be produced by the new system and what data will be provided to the system.

  • Analyst 
  • Designer
  • Coder
  • Manager

A ‘facilitator’ controls the meeting can be ________

  • Customer
  • A developer
  • An outsider
  • All of given

Version control combines ______ to manage different versions of configuration objects that are created during software product development.

  • Procedure
  • Tools
  • Procedure and Tools 
  • None of given

Many software projects digress from the original scope because of the nature of the software product or technology used, it’s happen in ________

  • Product scope changed toward the end of the project life cycle
  • Research-oriented software development 
  • Defined scope
  • Fuzzy users

When you build a product or system, it’s important to go through a series of predictable steps – a road map that helps you create a timely, high-quality result, The road map that you follow is called a ________

  • Software design
  • Software process 
  • Software schedule
  • Framework

Software design is actually a multi step process that focuses on _______ distinct attributes of a program

  • 2
  • 3
  • 4
  • 5

 When you build a product or system, it’s important to go through a series of predictable steps – a road map that helps you create a timely, high-quality result, The road map that you follow is called a __________

  • Software design
  • Software Process
  • Software schedule
  • Framework

The check-in and checkout facilities provide___________

  • Best control
  • Component control
  • SCI control
  • Synchronization control

 Which of the following might require re-baselining of the cost baseline?

  • Corrective action
  • Revised cost estimates
  • Updates to the cost management plan
  • Budget updates

 Once the review is complete, the Software Requirements Specification is “signed-off by _________

  • Developer
  • Customer
  • Top level Management
  • Both Customer and Developer.

Controlling Versions is activity of ________

  • Construction
  • Testing
  • SCM
  • Design

 ________ identify which quality standards are relevant to the project and determines how to satisfy them

  • Quality planning
  • Quality assurance
  • Quality control
  • Process control

 The British Standards Institution (1986) has stated the quality as

  • The ability of a software product to satisfy its specified requirements
  • “An inherent or distinguishing characteristic or a property”
  • “Quality is in the eye of the beholder, a matter, of the client’s judgment.”
  • All of the given

 ________ ensures that the standards laid down for a project are followed.

  • Quality assurance 
  • Quality control 
  • Product evaluation 
  • Process control 

 ________ ensures that appropriate steps to follow the product development procedures are carried out

  • Quality Management 
  • Design
  • Process monitoring 
  • Quality Control

 These all are Product Revision Factors except

  • Usability
  • Maintainability
  • Flexibility
  • Testability

 To control versions, you can use_____________

  • Version Control File
  • Version Control Register
  • Version Control authority
  • All of given

  _________is an umbrella activity that ensures conformance to standards and procedures throughout the SDLC of a software product.

  • SQA
  • Design
  • Testing
  • All of given

 All of the following are benefits of meeting quality requirements

  • An increase in stakeholder satisfaction
  • Less rework
  • Low turnover
  • Higher productivity

 The Preliminary Users Manual presents the software as a black box: That is, heavy emphasis is placed on

  • User input
  • User output
  • User input and the resultant output
  • None of given

  Which of the following might require re-baselining of the cost baseline?

  • Corrective action
  • Revised cost estimates
  • Updates to the cost management plan
  • Budget updates

 

Before requirements can be analyzed, modeled, or specified they must be gathered through a/an _______

  • Elicitation process 
  • Interviewing 
  • Meeting 
  • None of given

Defined scope is a

  • Technology-related problems 
  • Product-related problems 
  • Process-related problems 
  • People-related problems

 You can use the Item Traceability Matrix to identify _______ at the end of each phase

  • SCIs
  • SCM
  • Design
  • Construction

 Most software project manager’s practice a lot of management techniques that are of doubtful authenticity are called

  •  Project management tools
  • Project management myths
  • Project management thumb rules
  • Project management fundamentals

 The Introduction of the software requirements specification states the

  • Goals
  • Objective
  • Design
  • Goals and objectives of the software

 The code generation step performs the task 

  •  Translated specification into a machine-readable form
  •  Translated design into a machine-readable form
  •  Translated requirements into a machine-readable form
  •  Translated user data into a machine-readable form

 ———–is the ability to encourage by “push or pull” technical people to produce to their best ability.

  •  Evaluating
  • Motivation
  • None of the given
  • Monitoring

 __________contains an analysis of what went wrong, what went right, and what you could have done better in the software project.

 Select correct option:

  • Prepare closedown report
  • Identify learning
  • Identify reusable
  • software components

 Finally, the specification includes a ________

  •  Bibliography
  •  Appendix
  •  Both Bibliography and Appendix
  • None of the above

Product quality depends on its conformance to ______

  • Software requirements
  • Development standards
  • Implicit requirements
  • All of given

 Given all are major design styles except

  • Object 
  • Procedural
  • Structured
  • Dtat-Structured Design

 The quality of software is said to be high if it meets the

  •  Standards, defined for the product
  • Procedures, defined for the product
  • Standards and procedures, defined for the product
  • Design defined for product

Check Also

CS615 Today Solved Quiz 03 Fall 2013 Solved By Arslan Ali

Quiz Start Time: 08:18 PM Time Left 63 sec(s) Question # 1 of 10 ( …

Leave a Reply

Your email address will not be published. Required fields are marked *

*